Area myBM
Username Password  
Non ricordi i tuoi dati?
Non hai un account? Crealo!
BanconoteMondiali.it - Current Transformer Field Tester
BanconoteMondiali.it
BanconoteMondiali.it
| | | | | |
Username:
Password:
Salvare la password?
 Tutti i forum
 Banconote
 Compro Banconote
 Current Transformer Field Tester
 Nuova discussione  Rispondi alla discussione
 Stampa discussione
Autore Discussione precedente Discussione Discussione successiva  

whgdmk12345

1098 Messaggi

Postato il 12/27/2022 :  02:34:01  Mostra profilo  Rispondi con Quote
https://www.mktester.com/transformer-test-system/current-transformer/current-transformer-field-tester.html

Product description#65306;

Current transformer field tester was developed with high-end testing technology, large-scale electronic circuit design and accord with national related protocol . It has solved the problem of big working intensity,trival operation while on-site test of current transformer, voltage transformer. Meanwhile the product has a reliable performance,and the function is strong.



Technical index#65306;

Test range: 5A/5A~25000A/5A or 5A/1A~5000A/1A

Tested current transformer work scope: 1% ~ 120%

Second load: 2.5 VA ~ 300VA, COS = 0.8 ~ 1.0

Be tested current transformer accuracy range: 1.0, 0.5, 0.5 S, 0.2 and 0.2 S

Resistance, admittance measurement errors: #8804;5.0%

Measurement range: R:0.00 ~20.0 Y:0.000mS~100.0 mS

Power consumption: 20 VA

Accuracy level: 0.05 S level

Shape dimension(mm): 460(L)*375(W)*183(H)

Weight (kg): 10



Feature#65306;

HCCT-H Current Transformer Field Tester with recursive method to measure current transformer error, as well as potential difference method to measure voltage transformer error function, convenient for carrying out calibration work of field metering device.

HCCT-H Current Transformer Field Tester without using Standard Current Transformer, Current Source, Load Box, Double Adjustable Control Box and Primary cable, using extremely simple test connection and operation to realize the current transformer test, greatly reduce work intensity and improve the work efficiency, convenient to carry out current transformer field test work.
  Discussione precedente Discussione Discussione successiva  
 Nuova discussione  Rispondi alla discussione
 Stampa discussione
Vai a:
BanconoteMondiali.it © BanconoteMondiali.it Torna su
Powered By: Snitz Forums 2000 Version 3.4.07
Copyright © 2002-2010 Banconote Mondiali.it. All rights reserved.
Powered by Mattatore.it