Area myBM
Username Password  
Non ricordi i tuoi dati?
Non hai un account? Crealo!
BanconoteMondiali.it - Insulation Resistance Tester
BanconoteMondiali.it
BanconoteMondiali.it
| | | | | |
Username:
Password:
Salvare la password?
 Tutti i forum
 Banconote
 Compro Banconote
 Insulation Resistance Tester
 Nuova discussione  Rispondi alla discussione
 Stampa discussione
Autore Discussione precedente Discussione Discussione successiva  

whgdmk12345

1098 Messaggi

Postato il 06/30/2022 :  03:36:05  Mostra profilo  Rispondi con Quote
https://www.mktester.com/ground-resistance-tester/insulation-resistance-tester.htmlProduct description#65306;

Insulation Resistance Tester is suitable for measuring high capacity transformers, transformers, generators, high voltage electric motors, power capacitors, power cables, surge arresters and other ideal insulation resistance test equipment.



Technical index#65306;

Model

BC2306

Rated

Voltage

5000V

10000V

Measuring Range

0.0#65374;99.9M#937;

100#65374;999M#937;

1.00#65374;9.99G#937;

10.0#65374;99.9G#937;

100#65374;200G#937;

0.0#65374;99.9M#937;

100#65374;999M#937;

1.00#65374;9.99G#937;

10.0#65374;99.9G#937;

100#65374;400G#937;

Open circuit

Voltage

DC 5000V +20%, -0%

DC 10000V +10%, -0%

Short-circuit

Current

Approx 3.3mA

Accuracy

±5%±3dgt

100G#937;or more

±20%



Insulation Resistance Tester


Note: When you use the instrument for the first time, it is asked to need charging 6 hours otherwise the instrument may does not work normally. Charging method see chapter of Battery in the below relevant content.



1) Please cut power supply and remove any outgoing connctions to DUT (Device under test) before testing, and DUT will be shorted to ground for discharging 1min, DUT of larger capacity should be discharging at least 2min in order to avoid electric shock and impact of the discharge measurements.

2) With a dry soft cloth to wipe clean the dirt surface, if necessary, wash with gasoline before fouling the surface of the casing in order to eliminate surface leakage current of test results.

3)High Voltage testing wires (red) put into position (3)-LINE, hook the other

end connected high voltage conductor, testing line (green) put into position (2) -GUARD, the other end to be connected to the HV retaining ring of DUT to eliminate the impact of surface leakage current (see "GUARD" description in related content), the other black test lead put into the earth terminal (1) - EARTH, the other end is connected to the shell of DUT or to the ground.

Insulation Resistance Tester (2)
  Discussione precedente Discussione Discussione successiva  
 Nuova discussione  Rispondi alla discussione
 Stampa discussione
Vai a:
BanconoteMondiali.it © BanconoteMondiali.it Torna su
Powered By: Snitz Forums 2000 Version 3.4.07
Copyright © 2002-2010 Banconote Mondiali.it. All rights reserved.
Powered by Mattatore.it